Comparison of renewable energy markets
Market benchmarks from the enedeal database and results calculated with the same engine as the calculator — for a 10 MWp PV project.
Markets
Initial Enedeal estimate — market verification in progress
Data sources
The calculations are indicative and based on market benchmarks. They do not constitute investment advice or an offer. A precise analysis requires project data.
Calculation methodologyComparison of two markets
1,000kWh/kWp
Yield
0.50EUR/Wp
CAPEX PV
16.8%
Equity IRR
4.5 mlnEUR
NPV at WACC
76.7EUR/MWh
LCOE
5.8years
Payback period
1,600kWh/kWp
Yield
0.45EUR/Wp
CAPEX PV
29.0%
Equity IRR
10.2 mlnEUR
NPV at WACC
58.9EUR/MWh
LCOE
3.5years
Payback period
The calculations are indicative and based on market benchmarks. They do not constitute investment advice or an offer. A precise analysis requires project data.